Home › Manual › LPD Flow: Lean PlanDo manual
Manual › Lean PlanDo Flow
LPD Flow
- What is Lean PlanDo Flow? Learn what Lean PlanDo Flow does and what each item in the Flow menu is for.
- Lean PlanDo Flow minimum specifications Check the computer, browser and internet speed you need to run Lean PlanDo Flow well.
- User roles in Lean PlanDo Flow See the roles a user can have in Lean PlanDo Flow, by company type, and read the table of what each role can do.
Modules: Safety, Design, Quality, Precast
- Safety module in Lean PlanDo Flow Run your site safety forms digitally: add them from the Library, publish them, start their workflows and track them.
- Design module in Lean PlanDo Flow Run RFIs, transmittals and design reviews as digital forms with workflows in Lean PlanDo Flow, with each open query showing on the look-ahead.
- Quality module in Lean PlanDo Flow Turn your project's quality inspection forms into digital forms with workflows, then schedule, start and track them in Lean PlanDo Flow.
- Precast (Procurement) module in Lean PlanDo Flow Track precast elements and long-lead materials from order to installation as digital forms in Lean PlanDo Flow, each tied to the activity that needs them.
Library
- Library Find ready-made industry standard forms in the Flow Library and add them to your project as templates.
Templates
- Flow templates Find, filter, publish and create the form templates your project uses in the Templates tab of Lean PlanDo Flow.
- Create a blank template Build a new form from scratch in the Flow form builder, customise its fields, then save and publish it.
Workflow and History
- Workflow tab Find, filter, export and cancel the workflows your team has started in the Workflow tab of Lean PlanDo Flow.
- Create a workflow Build a workflow for a Flow template: add steps and actions, set statuses and processing times, and save it.
- Start or schedule a workflow Publish a Flow template, then start its workflow now or schedule it for a set date with assignees for each step.
- Best practices for workflow design Follow three rules so your Flow workflows never get stuck and you can assign users while the workflow runs.
Directory
- What is the Directory in Lean PlanDo Flow? Keep the project's lists (suppliers, locations, equipment) as Excel files that forms read from, in the Flow Directory tab.
- Upload and update a Directory file Upload an Excel list to the Flow Directory, prepare its headings, and add a new version when the list changes.
- Use a Directory file in a form Fill a dropdown's options, a table's headings or a table's rows from an Excel list in the Flow Directory.