Home › Manual › Modules: Safety, Design, Quality, Precast: Lean PlanDo manual
Manual › LPD Flow
Modules: Safety, Design, Quality, Precast
- Safety module in Lean PlanDo Flow Run your site safety forms digitally: add them from the Library, publish them, start their workflows and track them.
- Design module in Lean PlanDo Flow Run RFIs, transmittals and design reviews as digital forms with workflows in Lean PlanDo Flow, with each open query showing on the look-ahead.
- Quality module in Lean PlanDo Flow Turn your project's quality inspection forms into digital forms with workflows, then schedule, start and track them in Lean PlanDo Flow.
- Precast (Procurement) module in Lean PlanDo Flow Track precast elements and long-lead materials from order to installation as digital forms in Lean PlanDo Flow, each tied to the activity that needs them.