Home › Manual › LPD Flow › Lean PlanDo Flow minimum specifications

Lean PlanDo manual › LPD Flow

Lean PlanDo Flow minimum specifications

Check the computer, browser and internet speed you need to run Lean PlanDo Flow well.

Lean PlanDo Flow works best when your setup meets these minimum or recommended specifications:

  1. Laptop or workstation: any laptop or PC with at least 8 GB RAM, with any processor.
  2. Browser: the latest Chrome, Safari, Firefox or Edge.
  3. Internet: at least 10 Mbps.

Last updated 2022-06-23. Part of LPD Flow in the Lean PlanDo manual. Lean PlanDo by Lean Station.