Home › Manual › Directory: Lean PlanDo manual
Manual › LPD Flow
Directory
- What is the Directory in Lean PlanDo Flow? Keep the project's lists (suppliers, locations, equipment) as Excel files that forms read from, in the Flow Directory tab.
- Upload and update a Directory file Upload an Excel list to the Flow Directory, prepare its headings, and add a new version when the list changes.
- Use a Directory file in a form Fill a dropdown's options, a table's headings or a table's rows from an Excel list in the Flow Directory.