Lean PlanDo manual › Getting Started
Minimum specifications for Lean PlanDo Project
Check the computer, browser and internet speed you need to run Lean PlanDo Project well.
Check that your computer and connection meet these minimum and recommended specifications, so that Lean PlanDo Project works at its best.
- Laptop or workstation: any laptop or PC with at least 8 GB RAM, with any processor.
- Browser: latest Chrome, Safari, Firefox or Edge.
- Internet: at least 10 Mbps.
Last updated 2022-09-14. Part of Getting Started in the Lean PlanDo manual. Lean PlanDo by Lean Station.