Home › Manual › LPD DMS › Preview and mark up a PDF in the DMS

Lean PlanDo manual › LPD DMS

Preview and mark up a PDF in the DMS

Open a drawing or PDF in the viewer, draw a rectangle, circle or free line on it, and save the marks.

Double-click a PDF to open it. Pages load as you scroll. The toolbar has three mark-up tools: rectangle, circle and free draw. Draw on the page to point at a detail, for example the clash on a services drawing.

Click Save to keep the marks with the file. Delete removes the selected mark before you save.

Images (jpg, png and the rest) open in the same viewer without the drawing tools.

Last updated 2026-10-13. Part of LPD DMS in the Lean PlanDo manual. Lean PlanDo by Lean Station.